In order to ensure the normal operation of the industrial warming module, we need to understand its basic principles, including modules, air outlets, pipeline directions and detailed layouts.During the on -site survey, we found that the pipelines may encounter a beam problem when the pipeline wiring is reasonable.To solve the beam problem, a effective beam device needs to be applied to reduce wind resistance and ensure the function of the residential area.
In order to prevent noise infection, the location of the generator set should be as much as possible to stay away from home bedrooms.After the device is checked, it should be covered with a plastic film to avoid the use of fine dust hazards.When installing the pipelines of the industrial heater pipeline unit, the pipeline should be concentrated as much as possible to reduce wind resistance and ensure the supply of wind and rain.
The connection between the fan and the pipeline should use white canvas, try to connect beads as much as possible, and use horseshoe iron or pipe hoop to swell the soil to ensure that the joints are not easy to seep and fall off.In addition, the intake port of the fan should be increased to ensure the distance of more than one meter between the air inlet and the air outlet to prevent the fresh environmental quality of the fresh environment just entered the room.
After the acceptance of the air -conditioning engineering, the server should run normally after power generation.For 220V air conditioners, you need to identify whether the motor is rotating.At the same time, it is necessary to check whether the pipeline and server are blocked without major leakage.The entrance and exit speed of the fan should be kept at 3-5m/s.
Well, the questions that you need to know about industrial thermal aircraft should be shared here with you