Precautions
1. Please install the air curtain machine above the indoor door. The distance between the air outlet from the air curtain is higher than 2.3 meters.
2. The distance between the air curtain and ceiling is kept above 5 0 m m.
3. If the two wind curtain machines are used side by side, the distance between the curtain machine should be kept 10-40 mm.
4. Please do not install the screen machine in an environment that is easy to splattered in water or long -term humidity, and avoid contact with explosive gas and corrosive gas.
5. If you want to hang on the ceiling, the user needs to buy and install accessories.
6. Do not connect the power of the wind curtain before installation.
7. Please install it in a strong place, because the wind curtain machine may loosen the wall or vibrate the ceiling to produce unnecessary noise.
8. It must be used at the voltage and frequency required by the nameplate.
9. When the air curtain machine is working, please do not cover the air inlet and outlet.
1 0. Conventional maintenance should be carried out every year.
1 1. Do not use gasoline, benzene, diluent or other similar chemicals.
1 2. When the socket is powered by the socket, the wind curtain machine should be equipped with the corresponding plug; when the air curtain mechanical line is directly connected to the power supply, the distance between the contacts is not less than 3 m m.
1 3. When the power cord of the air screen needs to be replaced or maintained, please contact the maintenance department to repair and replace the designated professional and technical personnel.
installation method:
1. Remove the installation board from the wind curtain machine.
Remove the fixed screws of the installation board and the curtain machine to remove the installation board.
2. If it is installed on a hard wall such as mixed mud or brick walls, you need to determine the position of the fixed screw of the installation board on the wall, and then use the M8 expansion screw to be fixed.Essence
3. If it is installed on a wooden board and other software walls, use the S T 5 self -attack nail to fix the installation board on the wall.
4. After the installation board is fixed, hang the air curtain machine on the installation board, and then tighten the fixed screws of the installation board and the wind curtain fuselage to ensure that the installation is firm.
5. Hanging installation: The user needs to purchase a pendant, first fix the pendant, and then install it.
6. Installation of ceiling: users need to buy self -purchased ventilation pipelines