Pay attention to the following points when installing the air curtain:
1. Installation location: The curtain machine should be installed indoors, and the distance from the outlet to the ground should be higher than 2.3m.If it is installed outdoors, the wind drawn by the wind curtain machine is an outdoor hot air, which will increase the air -conditioning loss and play a negative effect.At the same time, do not install ordinary air curtain machines near flammable materials such as steam, dust, oil fume, corrosive gases, splashing or curtains such as steam, dust, oil fume, corrosive gases, splashing water, or curtains.
2. Installation method: The wind curtain machine should be installed horizontally, and the general wind curtain machine (non -ceiling machine) should be kept at a distance of more than 50mm from the ceiling.If two or more typhoon curtain machines are used side by side, the curtain machines should be kept at a distance of 10mm-40mm.In addition, when installing and moving, the air guide board is not allowed to be lifted, and two people should support the metal bottom plate behind the curtain machine to prevent plastic shells fromBroken.
3. Firm installation: The installation of the air curtain must be firm to prevent long -term operation from causing the loosening of the wall to bring danger or ceiling vibration to produce additional noise.The bottom plate must be firmly fixed on the wall (or on the column), and the connection between the fuselage and the bottom plate must be firm.
4. Power configuration: The socket of the air curtain machine needs to be configured separately, and the socket should not be mixed with other electricity.The air curtain must use 3 plug plugs, and they need to be well grounded. They are not allowed to change to two socket plugs.
5. Preparation before installation: Before installation, the size of the door frame should be measured, and the type of air curtain machine that can meet the requirements can be met according to the height and width of the door.At the same time, it is necessary to confirm whether the door head has a position to install the air curtain machine. Check whether the machine equipment is normal, whether the appearance is complete, whether the accessories are complete, and whether the power supply position is far away to avoid insufficient power lines and cannot connect.

Related News
Read More >>
Pipe connection method of air Pipe connection method of air
06 .18.2024
Air suspension fans are efficient, environmentally friendly ventilation equipmen
Installation and debugging of Installation and debugging of
06 .18.2024
Before installation: Before installation, first prepare the materials and tools
Advantages and adjustment meth Advantages and adjustment meth
06 .18.2024
A centrifugal fan is a mechanical device that relies on input mechanical energy
How to debug a centrifugal cur How to debug a centrifugal cur
06 .30.2024
The debugging of the centrifugal curtain machine mainly includes the following s

Leave Your Message