The steps of centrifugal air screen mainly include the following steps:
1. Prepare tools and materials: First of all, you need to prepare installation tools such as screw knives, electric diamonds, wrenches, and installation materials such as screws and expansion tubes.
2. Determine the installation location: Determine the installation location of the air curtain according to the needs and venue conditions.This position should be stable and not easily disturbed by the outside world to ensure that the air curtain machine can run normally.
3. Install the bracket: Fix the bracket on the wall.This usually involves punching on the wall and fixed with the expansion tube.Then, fix the bracket on the wall with a screw to ensure that the bracket is stable and reliable.
4. Install the air curtain: Place the air curtain on the stand and adjust the position to match it with the installation position.After that, use the screw to fix the air curtain on the bracket to ensure that the air curtain machine is stable and not shaking.
5. Connect the power supply: According to the power requirements of the air curtain machine, select the appropriate power cord and connect it to the power interface of the screen machine.Be sure to ensure that the connection of the power cord is firm and reliable and meets the safety requirements.
6. Test operation: After the installation is completed, perform the test operation of the curtain machine.Open the power supply, observe the operation of the air curtain machine and air volume, and ensure that it runs normally without abnormal sounds.
Please note that these steps are only general guidance, and the specific installation steps may be different due to different types of flames.In the actual installation process, it is strongly recommended to refer to the detailed installation guidelines or manuals provided by the manufacturer to ensure that the installation is correct and safe.
At the same time, in order to ensure the safety of use, the load capacity of the power cord must be checked before installation to avoid fire accidents.In addition, the curtain machine must not be installed near the flammable buildings to prevent fire risk.During the normal use process, the wind curtain machine should be regularly maintained to ensure that it is in a good state.
Finally, if you have any questions or uncertainty about the installation process, it is recommended to seek help from professionals.They have rich experience and professional knowledge, and can provide you with accurate guidance and suggestions.
The above is the step of installing a centrifugal air screen

Related News
Read More >>
Pipe connection method of air Pipe connection method of air
06 .18.2024
Air suspension fans are efficient, environmentally friendly ventilation equipmen
Installation and debugging of Installation and debugging of
06 .18.2024
Before installation: Before installation, first prepare the materials and tools
Advantages and adjustment meth Advantages and adjustment meth
06 .18.2024
A centrifugal fan is a mechanical device that relies on input mechanical energy
How to debug a centrifugal cur How to debug a centrifugal cur
06 .30.2024
The debugging of the centrifugal curtain machine mainly includes the following s

Leave Your Message