The installation method and requirements of the vertical sidhair scen machinwd

Views :
Update time : 2024-06-30

Make sure that the air curtain machine is installed on the door frame, the width of the door hole needs to be less than or equal to the length of the wind curtain.If the door is too wide, you can connect to the installation and use several curtain machines.
The corner of the body needs to be inserted into the installation pores on the installation plate.
During the installation process, the wind curtain machine must be avoided, especially when the installation door is hollow wood, gypsum board or glass door frame, you can use brackets and corner steel as support to prevent the wind curtain from falling.
Do not block the air inlets of the curtain machine, the reserved distance should be greater than equal to 5 cm.Most of the air inlets are horizontal directions, and a small part is the direction of the wind.
When installing the air curtain machine at the entrance and exit of the cold storage, the air outlet cannot be installed vertically downward, and its angle with the door frame should be appropriate.When the tilting angle is too large, the air outlet of the wind curtain is more cold outside the library. The shot away from the door frame will leak air -conditioning by the door.When the angle of angle is hour, the air in the library is introduced, and the return area becomes larger, which will make the calories and water outside the library enter the library.
The operation of the air curtain and the air outlet requires sufficient airflow fields. Therefore, the curtain machine and ceiling must be kept more than 50mm, and it must not be installed on the ceiling.
After the installation is completed, it is necessary to check whether the power line is connected correctly, and use a soft fabric to wet the winding agent, and the winding panel, wind curtain blades and hoods of the cleaning equipment.
The above is the installation method and requirements of the vertical side hair screen machine. Refer to the above steps to ensure that the air curtain machine can operate correctly and effectively.
The above is the installation method and requirements of the vertical side hair dryer style. I hope it can help you. If you want to know more information, please pay more attention to us- ——

Related News
Read More >>
Pipe connection method of air Pipe connection method of air
06 .18.2024
Air suspension fans are efficient, environmentally friendly ventilation equipmen
Installation and debugging of Installation and debugging of
06 .18.2024
Before installation: Before installation, first prepare the materials and tools
Advantages and adjustment meth Advantages and adjustment meth
06 .18.2024
A centrifugal fan is a mechanical device that relies on input mechanical energy
How to debug a centrifugal cur How to debug a centrifugal cur
06 .30.2024
The debugging of the centrifugal curtain machine mainly includes the following s