There will be use in many occasions now. It is a systematic project. What should I pay attention to when installing and using the new group. Lets look at it below:
1. A comprehensive inspection of each component of the fresh air units, such as whether the parts are complete: whether there is any damage to the main components such as the leaves, the spindle, the bearing, etc.: whether the transmission group is flexible: whether the rotation direction of the leaf and the case is consistent, etc.If the problem is found, it should be repaired and adjusted immediately;
2. The fresh air unit should be lifted horizontally and the suspension shock absorber should be equipped. The boom and the unit base are kept vertically, which is locked by the nylon tight mother or other methods;
3. The new air unit shall not bear the weight of the outer water pipe and duct.
4. You need to punch a punching on the wall. When choosing the installation position, you cannot at the cost of destroying the overall structure of the room. You should ensure that the wall is not damaged;
5. After confirming that the ability of the lifting equipment is rich enough, it can be lifted, and pay attention to the center of gravity of the suspension parts to avoid unnecessary accidents during the lifting process;
6. The location of the air outlet is very important. It should reasonably choose the location of the new air system out of the air outlet and deal with the relationship between the position and return the air inlet to avoid mutual influence;
7、新风机组通电后,检查风机转向是否正确,如有反转,应立即停机改变相序重新接线,机组内每台风机电控装置各自需要良好的接地及过载、过热、缺相等保护,保证Good ground.
The above is some of the situations that need to be paid attention to in the installation and use of fresh air units. I hope that the above content will help you some. For more relevant information, please follow us.