To ensure the service life of the equipment, you must not only use the equipment correctly, but also install the equipment correctly, otherwise it will be used.In order to ensure the service life, let us first understand the precautions for installation.1. The surface of the basic concrete should be cleaned and flat, and check the flatness.If it is not indicated, the uneven part can be flattened.2. Put the explosion -proof on the basis and insert an iron pad between the foundation and the base to ensure the mortar flow.Adjust the horizontal degree with iron to make the explosion -proof seat in a relatively horizontal state.3. In general explosion -proof installation, the rectangular pad (steel plate) of different thickness can be prepared for adjustment.The explosion -proof of the joints can be checked with a coupling, and the horizontal adjustment can be fixed after welding.Put the fixed size block into the sides of the basic bolt.In the process of adjusting the liquid level, there are also regulatory bolts.4. The foot bolt hole through the base should be perpendicular to the square hole of the ground bolt.5. Inject sufficient mortar into the gap between the foot bolt holes and the foundation and basic concrete to ensure the strength of the concrete structure.When installing important or high -precision explosion, mortar fillers should be embedded in the ground bolt hole.After completely hardening, the mortar filler should be re -adjusted to the level.After the installation accuracy is reached, the gap between the mortar filler and the bolt cement should be re -adjusted.