WexDs side wall smoke uses advanced predatable leaves, low -noise outer rotor or internal rotor special motor direct transmission. The square shell design can be easily installed on the concrete wall, brick wall or light steel pressure wall plate.The square rainproof cover structure is strong and beautiful.It has the characteristics of low noise, large air volume, reliable operation, wide range of performance parameters, and simple installation. It is widely used in the side wall wall -type ventilation and ventilation of factory and mining enterprises and civilian and commercial construction projects.According to the requirements of the conveying medium, it can be made into anti -corrosion and explosion -proof types.
Preparation before installation of WEXD wall exhaust device:
1. Before installation, you should be familiar with the instructions of the axis flow fan, and to clarify the ventilation system drawings of the fan work. After the equipment arrives, you need to open the box to check the various components of the fan. Whether the outside of the case is injured.Trocketing injury deformation, whether each component is connected tightly, whether the leaves are damaged, and whether the rotation of the leaves is flexible. If the problem is found, you should find the relevant units to repair and replace it in time.
2. Check the foundation of the fan: It must have sufficient strength and stiffness to ensure the load that can withstand the fans when running. At the same time, it is necessary to check whether the connection size of the foundation and the fan meets the design requirements: the basic buried parts of the concrete, the size of the hole, etc.EssenceThe equipment foundation should not have cracks, peeling, and steel bars. The basic elevation and central line should be within the allowable error range specified in the technical documents.
3. Foundation: Measurement must be based on the coordinates and horizontal elevations provided according to the requirements of the Civil Construction.Use the standards and the whole station to measure the elevation and coordinates of each installation point and mark it.Release the centerline of each installation position according to the axis.
The above is the preparations before the installation of the wexd wall exhaust device, hoping to help you.If you want to know more about related information, please pay more attention to us--