1. Freshly familiar with the samples of high -temperature smoke, the familiar specifications, forms, the rotation direction of the leaf rotation, and the direction of the air flow in and out, etc. The leaf wheels should be checked before installation, and each component should be checked.Whether each component is linked to whether the wind leaves should be damaged or deformed due to transportation, otherwise it should be installed after repair.
2. The duct connecting to the fans should be supported by separate support. The weight of the pipeline is not allowed to be added to the component of the fan. When installing the fan, pay attention to the horizontal position of the fan.It should be adjusted to make it natural, and it is not forcibly connected.
3. After the fan is installed, pull the impeller by hand or leverage to check if there is too tight or rubbing the phenomenon. There is no item that hinders rotation.There is a protective cover.If the air inlet of the fan does not connect to the pipeline, the protective network or other security devices need to be added.
4. The wind turbine wiring must be correct and reliable, the fan shell should be properly grounded, and the ground must be reliable.The power supply of the fan must be complete and meets relevant requirements.Electric wiring must have electrical wiring with professional knowledge.
The above is the introduction of the installation of fire high -temperature dual -speed shaft flowing fan of fire protection. I hope it will be helpful to you.If you want to know more about related information, please pay more attention to us--